Work on the construction site continues according to schedule.

Buildings No. 12 and No. 13

An important stage of the formation and protection of the buildings has been completed:

  • reinforced concrete floors and parapets have been installed;
  • the basement has been waterproofed and the drainage system has been installed;
  • the soil has been backfilled and the monolithic thresholds have been filled. A new stage has begun – masonry of internal walls made of aerated concrete blocks.

Buildings No. 19 and No. 22

Active monolithic works are underway:

  • in building No. 19, the horizontal floor slab and parapets have been poured, work on waterproofing and drainage has begun;
  • in building No. 22, the vertical part of the structure has been completed, formwork for pouring the floor slab is being erected.

A jacuzzi has been installed – another step towards creating a space for recovery and comfort.

Landscaping

Current repairs to access roads have been carried out to ensure convenient access for special equipment.